Mosaic restoration step by step: from consultation to handover
Every mosaic restoration is different, and the job is not only to bring the work back to its original state but also to get through approvals, keep to the deadline and follow the right technology. Here is how a consultation runs, how we survey a mural, and the twelve steps that every project goes through.
The consultation
In a conversation with the project manager the client gets answers to their questions and a rough plan of work. If useful, we also talk about what we do and show recently completed projects.
We usually visit the site to inspect the mural. The project manager assesses how badly it is damaged and what kind of damage it is; the plan of work and the final cost depend on this. On the "Faster, Higher, Stronger" mural in Nizhny Novgorod, for example, a large share of the slabs had to be remade: by the time of the survey many had lost tesserae through age and the effects of snow, rain and wind.
The survey also tells us how much material the restoration will need, and at this stage we agree the timing. Timing depends on the size and technical features of the mural: the stele in Toropets took just 17 days.
We then bring everything together into a commercial proposal. It covers materials, installation, the working time of our team (smalti makers, restorers, production manager, project manager and others) and other costs specific to the project. We use our own costing system and also take current market prices into account.
Step 1. Site survey
Time: 1–2 days. Who: a professional restorer.
The restorer visits the site to record the size of the mural, the material and the size of the tesserae. The survey gives us what we need for the proposal, the plan of work and the preparation of materials.
It starts with photography: the overall view, specific damage, the design and other details. The restorers use these photographs during the work, and so does the production manager, who either makes matching material in our smalti workshop or buys it in.
The restorer then examines the whole mosaic layer and taps it to find the tesserae that are least well fixed. Areas where adhesion has failed will later be replaced with new tesserae.
Next comes the type and extent of damage. Mosaics are usually destroyed by the weather (snow, rain, damp); sometimes we also find damage done by people, by accident or on purpose. The restorer studies the substrate as well: what it is made of and how damaged it is. If the damage is serious, the team will restore the substrate as well as the mosaic.
We also identify how the mosaic was laid. Most are set by the direct method, with smalti or other material pressed into the setting bed; a few are made by the indirect (reverse) method, but these are rare among murals that need restoration.
Parts of the mosaic that have not changed much are conserved, cleaned and returned to their place once the rest is rebuilt. Where a section cannot be kept whole, we transfer the surviving tesserae to a new base.
Finally, we always take samples of the smalti, stone or glass so that our workshop can make the closest possible match, or so that we can buy it. Our smalti makers work with Soviet smalti recipes, so when we restore Soviet mosaics we can produce a mix very close to the original. Glass and stone mosaics are rarer in restoration; for those we work with specialist suppliers who help us find the right material.
Steps 2–3. Proposal and plan of work
Step 2, the commercial proposal (3 days; project manager, workshop manager and restorer). The project manager reviews the survey data and calculates the final cost, taking in materials and their transport, colour matching in our smalti workshop, the work of builders and artists, and other expenses.
Step 3, the plan of work, agreed with the client (2–3 days; project manager). Although the main steps are always the same, we draw up a separate plan for each project. It depends on where the mural is (indoors or outdoors), its size, whether it is on a wall or a floor, how many areas need restoring and other factors. One of the key inputs is the current condition of the mural, which can range from an emergency that needs immediate intervention to a satisfactory state.
Steps 4–6. Materials, contractors and the site
Step 4, preparing materials (2 to 30 days; production manager and the smalti workshop team). Once the plan is approved, we prepare the restoration materials. We always keep 10–20 tonnes of smalti in many colours in stock, which is usually enough to assemble the main palette and start work. At the same time our workshop starts making the new colours that match the original.
Step 5, finding contractors (2 to 14 days, and usually continuing through the project; project manager and project administrators). On projects away from our studio, our permanent team works alongside specialist contractors. The project manager selects them to speed up the work, raise its quality and finish on time.
Step 6, preparing the site (from 1 day; construction and installation team). On a large site we put up proper fencing and set the site up in line with local regulations. Indoors, we prepare the room: fragile objects are removed, and floors and walls are protected from dust.
Steps 7–10. Removal, reassembly, transport and installation
Step 7, removing the mosaic (from 1 day; builders). Some restorations require the mosaic to be carefully taken down. Depending on its size, the site and other factors, this takes anywhere from a few hours to a week.
Step 8, reassembling the mosaic (from one week to several months; mosaic artists and restorers). One of the most interesting and important stages: the artists rebuild the mosaic piece by piece. When the adhesive has fully cured, our production team prepares the restored work for transport.
Step 9, transport (our own team or partners). The mosaic is packed for safe transport and taken to the site; for very large works we hire a specialist carrier. Timing depends on the location: a mosaic assembled in our Ulyanovsk workshop reached Nizhny Novgorod in one day.
Step 10, installation (from 3 days; builders and project manager). Like removal, installation depends on the size of the mosaic, the site and other conditions.
Steps 11–12. Clean-up and handover
Step 11, clean-up (1 day; builders). We care about leaving a clean, tidy site and clear it thoroughly after the work.
Step 12, handover (1 day; project manager). We agree the result with the client, sign the paperwork, hand over full documentation and material certificates, collect feedback and make final adjustments if needed.
We restore and conserve mosaic murals and can help you estimate the cost of the work and answer any questions.
Photos
22 photos — click to enlarge.
Planning a mosaic?
Tell us what and where you would like to place — our artist will suggest a sketch and we will calculate the cost for your space and timeline. We reply within one working day.