280 m² of new smalti for the 30 Years of Victory fountain in Samara
Restoring the mosaic of the 30 Years of Victory fountain in central Samara is one of the largest projects we have taken part in. In just over four months we developed and melted hundreds of new smalti colours and assembled more than 280 m² of mosaic.
- Location
- Samara, Russia
- Year
- 2020
- Area
- 280+ m²
- Material
- ArtWorker smalti matched to 1970s originals
- Time
- About 4 months
The project
In mid-2019 a tender was announced for restoring the fountain built for the 30th anniversary of victory in the Second World War. The job required recreating smalti to match original samples of material made in the USSR in the 1970s.
We made hundreds of smalti samples before moving to full-scale production. Once the smalti was ready, we reconstructed the mosaic from photographs and sketches of the original work.
Developing the colours
Because this was a restoration, the colours had to match the original 1970s smalti precisely. We started by developing them in laboratory furnaces and ran hundreds of experiments before we reached shades close to the originals. Red and orange were among the hardest colours to make, and they covered the largest share of the fountain.
We agreed the shades with the artists who had developed the sketch, then moved to melting smalti in industrial furnaces.
Production in industrial furnaces
To finish on time we had to make more than 10 tonnes of smalti in different colours in less than two months. When the laboratory recipes were scaled up, the colours came out very different from what we needed, so we reworked every recipe during industrial melting. With such a tight schedule we also built two extra furnaces and brought them into operation in the shortest possible time.
Assembling the mosaic
The second big task was assembling more than 280 m² of mosaic. We rented a whole hangar next to our smalti workshop and worked around the clock: smalti went to the artists before it had even cooled. More than 15 mosaic artists and assistants took part. We had only two months to assemble the mosaic and send it for installation, so the installation team could finish before the cold weather set in.
Sergey Kolbasov led the project, from making the smalti to creating the mosaic.
The finished fountain
The 30 Years of Victory fountain was officially opened in mid-October 2020, after a final wash of the mosaic.
Project gallery
26 photos — click to enlarge.
How we can make it for you

Mosaic restoration
We restore mosaics in smalti and mosaic tile from different periods, working with city authorities, churches and private owners. Every project starts with a survey on site, and we make replacement smalti to match the original in our own furnace.
Learn more
Custom smalti murals
We make murals in smalti from our own furnace for interiors, facades, swimming pools and fountains. Sketch, assembly in the studio, packing, shipping and installation by our own team.
From $1,230 per m²Similar projects

Restoring the smalti mural of the Glory Monument in Nizhny Novgorod
The 1980 Monument of Glory to the car-plant workers in Nizhny Novgorod had lost much of its smalti mosaic over four decades. In one month we cleaned it, rebuilt the failing areas and brought the 220 m² mural back to how it looked on opening day, using original tesserae and 1,500 kg of smalti we made to match.

Smalti matched to Soviet samples for the Pioneer Badge monument, Moscow
We are often asked to make smalti for restoring monuments. For the Pioneer Badge on Sparrow Hills in Moscow, we matched red and blue smalti to samples taken from the monument itself and produced about 800 kg of full-size bricks so it could regain its original appearance.

Restoring a Soviet relief mosaic stele in Toropets
Toropets, an ancient town, turned 950 in 2024, and as part of the anniversary improvements we restored the Soviet mosaic stele on its main street, with a hammer and sickle and an ear of wheat in relief on an orange smalti ground.
Like this project?
We will make a mosaic like this for your space: an artist proposes a sketch, a manager calculates the cost and timeline. The consultation is free.