Restoring a Soviet smalti mural at the Mechta children's camp, Tatarstan
A client asked us to restore the Soviet mosaic at the Mechta children's camp in the Republic of Tatarstan, by then worn and broken. We recorded it, drew the missing areas, made about 30 matching shades of smalti and rebuilt the losses on site.
- Location
- Mechta children's camp, Republic of Tatarstan, Russia
- Area
- 10 m²
- Material
- Original Soviet smalti; ArtWorker smalti for losses
- Technique
- Reconstruction of losses on site, cement grout
Survey and sketch
After many years outdoors the mosaic was in very poor condition. We began with a site visit and photographic recording with professional equipment, to document its state and capture the original colours accurately. This let us assess the extent of the losses and plan the restoration.
We then drew a preliminary sketch of the mural with all the lost fragments reconstructed. This meant close study of the surviving fragments: the direction of the rows, the transitions between shades and the surface texture, so that the new infills would blend into the whole. From this we wrote the brief for the smalti, and once the client had approved the sketch, our production began making it.
In our production we did everything we could to create colours as close as possible to the Soviet glass. We had to match not only the colour but the tone, so that the new fragments would be indistinguishable from the old.
Sergey Kolbasov, founder of ArtWorker Mosaic Studio
Preparing the panel
Before setting any smalti, the panel needed careful preparation. We checked that the surface was sound and level, paying particular attention to the areas of loss, where the new elements needed a reliable base that would hold their weight for years.
We cleaned off the dirt of many years, filled and levelled the losses and reinforced certain areas with mesh to anchor the new fragments. Finally we marked out the areas for the infills so that the work would be precise.
Reconstruction
This was one of the most interesting stages. Our artists chose the colours and rebuilt the missing fragments. The smalti arrived from our production as bricks, so we cut it on site with a smalti cutting machine and with hardie and hammer. The camp staff watched with interest as the mural gradually regained its original appearance.
Finishing
When the mosaic was complete, we grouted the joints with cement grout, which strengthens it and protects it from temperature swings, rain and snow. We then washed the surface and cleaned the joints once more. Staff and guests of the camp can now enjoy the renewed mural, a small but real contribution to preserving Soviet art.
Project gallery
20 photos — click to enlarge.
How we can make it for you
Similar projects

A smalti mural for the Wedding Palace in Almaty
In 2017 we made a 2.7 × 2.7 m smalti mural for the Wedding Palace in Almaty, after a sketch by a local artist. When we visited Almaty in summer 2023 it looked exactly as it did on the day it was installed.

280 m² of new smalti for the 30 Years of Victory fountain in Samara
Restoring the mosaic of the 30 Years of Victory fountain in central Samara is one of the largest projects we have taken part in. In just over four months we developed and melted hundreds of new smalti colours and assembled more than 280 m² of mosaic.

Smalti mural for the Pavlovo embankment viewing platform
The city administration of Pavlovo asked us to make a large mosaic for its new embankment. We assembled it from our own smalti on a 6 × 4 m table and installed it on the curved wall of a viewing platform above the Oka, where tourists and river cruises arrive.
Like this project?
We will make a mosaic like this for your space: an artist proposes a sketch, a manager calculates the cost and timeline. The consultation is free.

